Development of detailed design HV combined heating and power plant (food industry).

A detailed substation earthing study was previously completed on site, requiring close co-operation with a regional DNO (District Network Operator) – as a result of a unique connection configuration.

PTSG Specialist Earthing and Power was contracted to develop an earthing solution for the new build CHP plant. The installation work was undertaken by a third party, with the design development requiring co-operation with other professionals.

The design was completed ensuring that both industry- and client-specific requirements were adhered to. The final testing, commissioning and certification of a compliant installation were also undertaken by PTSG.

The design documentation was produced working in collaboration with others and enabled a safe, cost-effective and deliverable solution to be achieved.

 

Electrical
Electrical Testing
Electrical4
Lightning Protection Systems
Electrical5
Lightning Protection Testing
Electrical2
Specialist Earthing
Electrical3
Surge Protection

Free consultation

Which service or services do you require at your building(s)?

Our specialists will be happy to get in touch with you via your preferred method of contact. Please fill out the below for your free consultation.
Our Divisions
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
ErrorHere